New Availability

We’ve got a unit available!

Beautiful end unit townhome for sale in the Cully Grove Community. Award-winning architecture. Highly efficient green living. Beautiful wood trim and floors. Stainless appliances. Wonderful outdoor living with covered front porch and private backyard. So much to offer in this community! Cully Grove Intentional Community offers a shared common house with a meeting room, kitchen, and guest apartment. Raised garden beds, fruit orchard, play area and more!

Visit NWRealtySource.com to view the full listing.

4801 NE Going St Portland OR-large-001-007-Exterior Front-1500x1000-72dpi

4801 NE Going St Portland OR 97218

Priced at: $649,900

Bedrooms: 3- Plus additional craft/office space

Bathrooms: 2

Square Feet: 1,535

Year Built: 2014

Lot Size: Community on nearly 2 acres

Includes: Refrigerator, Washer & Dryer

Photovoltaic (PV) systems, Solar hot water, Air Quality: whole house heat recovery ventilators (HRVs)In-floor radiant heat, Water heated by tankless

Includes 4×6 storage locker & great attic storage

HOA Dues: $139 per month

View 3D Tour

View Tour Photos

Cully Grove 4801 front porch

Bollywood Feast (and dance party)

What do you get when you toss together Shajahan’s amazing cooking & tunes, a wonderful group of people, and some rocking music speakers in the common house?  A scrumptious Indian food dinner and Bollywood dance party!  We filled up the first floor pretty well, and also had kids/parents playing and eating upstairs in the larger guest room.

photo 1 photo 2

Veggies and Flowers everywhere

Cully Grove gardeners are amazing!  Less than a year from when folks started moving in, what used to be dirt and topsoil has been totally transformed.  Here are a couple recent photos.

CG front yards and shady courtyard
GC community garden

Meeting the Neighbors, KATU News story

2013-08-13 20.35.19 2013-08-13 20.35.03Last night we had a nice dessert gathering of Cully Grove residents and neighbors from Going St., Alberta St. and NE 94th.  LOTS of ice cream was consumed, thanks in large part to the under-6 crowd.

On Sunday, there was a KATU News story about Cully Grove during their Green Living segment.  Here’s a link.

Moving In!

2013-08-10 11.07.32 2013-08-10 11.08.44

It’s taken a while, but as construction wraps up we’re starting to move in for real!  The first 10 households have moved in or are in the process, and more will follow shortly.  Grass is starting to grow, kids are playing everywhere, and new neighbors are hanging out.  The common house is nearly done and there remain some little construction projects to wrap up.  But it’s starting to feel more ‘home’ than ‘jobsite’ at long last.

Two of the 16 homes are not yet sold.  If you’re interested in learning more about them, give us a call or e-mail at the numbers listed here.

Construction update 5.21.13

IMG_1881It was so beautiful yesterday I couldn’t resist climbing our neighbor’s tree to take this aerial shot of Cully Grove.  Utility trenches are all closed up (finally!) and we’ve been taking advantage of the lovely weather to pour front porch pads, build rear decks, go crazy painting building exteriors, and work on final site grading.  Meanwhile, interior subcontractors (tile, flooring, cabinets, electricians, plumbers…) continue rolling through the units.  Solar panels are up on all homes but the single family units – and those will be installed in the coming week.  Looking ahead, we’re scheduling out half street improvements along Going St. and curbs/paving of our driveway and parking spaces.  More soon!  – Eli

Construction update 1/10/13

IMG_1130We’ve had rain, mud, frozen ground… and for today: a little bit of snow.  Yet construction is zipping forward as we roll into 2013.  After trenching up the site for electrical underground service, we now have power extending to each home.  Almost half the units are sheetrocked and another 6 are on deck for insulation and sheetrock in the next couple weeks.  Next week, we’ll pour gypcrete over in-floor radiant tubing in the first batch of units, get most of the tile backer board and shower pans prepped, begin interior paint, and see the arrival of the first cabinets.  Outside, siding of the multi-unit buildings is nearly complete, carport foundations are nearly done, and  the common building comes next.  Also in the next couple weeks, we’ll start digging the well!  More soon…  – Eli

%d bloggers like this: